Photos

MERA work day June 3. “Snag” trail.

    This is the hill we have extended 317 to the top of.

       Brian and I got to do the hand work

                    Rob and Mark L. got to use the power tools.

This is a prototype tiller Mark L. is designing at Barreto Mfg.

End of long day group photo.